Telecommunications infrastructure with cellular tower
FormRift

Telecom & Infrastructure

Site surveys and intervention reports are often incomplete, hard to centralize and rarely available in time for audits.

Transformation

From problems to solutions

For every challenge, a direct answer in FormRift

The Challenge

Scattered site surveys

During a site visit — tower, central office, relay or hub — technicians fill out Word sheets, note measurements on paper and snap photos on their phone. Everything gets re-entered at the office, sometimes days later.

The Solution

Structured forms with required fields

Technicians capture their surveys on mobile or tablet, with dropdowns, controlled measurements and embedded photos. Data is complete and usable as soon as it's captured, with no re-entry at the office.

The Challenge

Incomplete records at acceptance

42% of unplanned outages in telecom infrastructure come from late detection, often tied to incomplete or missing surveys from the previous visit.

The Solution

Every intervention fully traceable

Every entry is timestamped, geolocated and tied to a technician and a site. Required fields and mandatory photos make sure nothing is missing at acceptance or audit time.

The Challenge

Interventions that come back too late

Towers, relays, remote sites: a large share of telecom infrastructure is in low-coverage zones. Surveys often come back at the end of the day, after the call for a second visit has already been made.

The Solution

Automatic sync as soon as the network returns

Submissions are captured offline and sync automatically as soon as the device is back in coverage. Deployment and operations leads get up-to-date data without waiting for teams to come back.

Your forms, ready to go

Industry-specific form templates, in your vocabulary

Telecom site visit

Technician name
Visit date
Site type
GPS location
Equipment present on site
Site photos
Technician signature

On-site intervention report

Technician name
Site reference
Date and time of intervention
Type of intervention
Nature of work performed
Before / after photos
Technician signature

FTTH acceptance report

Site or PM reference
Inspector name
Acceptance date
Optical tests passed
Reservations noted
Photos of the installation
Inspector signature

Interested in FormRift?

Talk to our team about how FormRift can streamline your operations.

Contact us